NBS Source
I'm a manufacturer

Rosewood Aged Care

OVERVIEW

There were two sets of challenges involved in the Rosewood Aged Care.


Firstly, waterproofing the basement. The basement was excavated around a heritage-listed building, which had to stay undamaged for the duration of the works. Piles and shotcrete were implemented for the construction, but there was no scope to install a membrane due to space and other limitations. The Markham BASE-TECT system was ideal for this situation.


Second were the requirements for moisture control and permanent hygiene protection for the interior floor slabs of the residential parts of the building. This is a more routine challenge, faced by aged care facilities with concrete floor slabs. AQURON 2000 MEDI+ was selected for concrete curing enhancement and permanent hygiene sealing.

No featured products in this case study

Contact Markham Global PTY LTD by clicking the button below to find out which products were used in this case study.

More inspiration from Markham Global PTY LTD

View inspiration
Silk Contract Logistics Warehouse

Silk Contract Logistics Warehouse

ABN Group Headquarters car park, Leederville Square

ABN Group Headquarters car park, Leederville Square