OVERVIEW
Our Smet Supported Partner, was delighted to deliver and install approximately. 7,000m2 of polymer-modified Rapidur EB5 Rapid Drying Sand/Cement screed bonded in the redevelopment of Blocks 3A & 3B as part of the Irish Life Campus on Lower Abbey Street.
Rapidur® EB5 Rapid Drying Sand/ Cement Levelling Floor Screed - Rapid Drying Cement Levelling Screed
44,000 m2 of Screed delivered to our partners for The National Forensic Mental Health Hospital in Portrane, Ireland
LiteFlo® Lightweight Flowing Screed | Fast Floor Screed | First Floor Timber frame
LiteFlo® Lightweight Flowing Screed | Floor Screed Ireland | Our Lady of Hope School Crumlin
14,000 m2 LiteFlo® Lightweight Flowing Screed | The Tower at GWQ London
Madrid Airport
Savoy Hotel Restoration Project
It’s a ‘race to the finish,’ as ARDEX UK complete Commonwealth Games Pool refurbishment in 8 weeks
ARDEX A 29 at Coalville Leisure Centre