OVERVIEW
Zentia worked with Ryder architects to help showcase products that can provide an in-depth insight and mechanics into behind the scenes of suspended ceilings. Featured areas was specified to use Zentia Axiom C Canopies with Aruba Max Board tiles, this enabled the students to see the suspension systems used and to showcase services behind the canopy.
Through the project Aruba Max was used due to excellent acoustic performance for sound absorption and attenuation. Prelude 24mm XL2 grid was specified due to ease and speed of installation. Axiom Transition was used to provide a smooth connection where tiles meet plasterboard boarder margins throughout the project.
Hydrabloc was used within the WC areas due to excellent moisture resistance capabilities and providing a Class A sound absorption. Zentia Prelude 24mm Corrosive resistance grid was specified alongside Hydrabloc due to the robust cleaning regime in keeping with being a technical college.
Harton Academy can have peace of mind with Zentia 30-year system warranty for Axiom Canopies and Hydrabloc due to it be installed on Zentia Prelude 24mm XL2 grid, whereas Aruba Max comes with a lifetime warranty.
These tiles have a high level of recycled content and are fully recyclable at their end-of-life.
DecoFrame Kit Classic Canopy - Floating Ceiling Suspension Kit
Hydrabloc High Humidity Resistant - Mineral Tile Suspended Ceiling System
Aruba Max - Mineral Tile Suspended Ceiling System
Aruba tiles at Capital Quarter
Complete ceiling system at Balloch Primary School in Scotland
Ystalyfera Welsh School
Complete ceiling solution for VELUX UK and Ireland HQ
The Compound Semiconductor Facility for IQE
The Rounhouse for Derby College
Ray Dolby Centre for Cambridge University's Physics Department
London Bridge Station (Network Rail)
cGMP Advanced Manufacturing Area for Orthoplastics
Compound Semiconductor Innovation Centre for CSA Catapult
cGMP Global Packing Centre for AstraZeneca
Quality Assurance Laboratory for a Pharmaceutical Blue Chip Client