OVERVIEW
At Sheares Hall, a major new student accommodation development on St James Boulevard in Newcastle, the façade strategy needed to balance architectural quality with strict performance, fire-safety and cost-efficiency targets. The project adopted DryKlad® across the primary residential elevations, with DryKlad Datona® introduced to deliver a refined, contemporary finish on key feature zones.
A significant advantage came from the use of the A2-rated DryKlad® isolator, which enabled a 100 mm reduction in the overall cladding zone without compromising thermal or fire performance. This leaner façade build-up not only improved spatial efficiency but also unlocked a 27% material cost saving at RIBA Stage 4, achieved through reduced insulation depth, a lighter substructure requirement and optimised bracket geometry — all contributing to a more economical and sustainable envelope.
The combination of DryKlad® and DryKlad Datona® provided Sheares Hall with a high-performance, fully compliant Rainscreen system capable of meeting the demands of a dense urban site. The resulting façade is modern, durable and precisely engineered, supporting the building’s role within the wider regeneration of the Newcastle Helix district while demonstrating the tangible project-stage value of an intelligent, engineered cladding support solution.
DryKlad® Datona Visible Fix
DryKlad® Support System
Escapade Silverstone
Knoll Park Youth Centre Hove
Redcliffe Quarter Bristol
Hyde Hendon
Vita Ruskin Square
Urbanest, Vauxhall
Blackwall Reach
Thames Park School
Amersham Vale, London
Radisson Red
Downer Framing Launches a new free framing tool
Downer Framing Helps Brent Cross Rise & Shine