OVERVIEW
SOLID WOOD FLOOR SYMPATHETIC CHOICE FOR HERITAGE
BUILDING
Junckers Black Oak flooring has been installed as part of the restoration of Paisley Town Hall. Architects Holmes Miller transformed the Grade A listed building into a high-end venue and public space with careful restoration work to preserve the grand Neoclassical architecture.
With a focus on future-proofing the venue in terms of environmental performance and adaptability, Holmes Miller’s design overhauled the existing building by stripping it right back and upgrading services to modern standards, including replacing the heating and ventilation systems with tempered air fed through concealed ducts hidden beneath the wooden floors and using destratification fans to recycle warm air, especially useful in auditorium which has a high ceiling. Accessibility was improved and new functions for previously unused spaces were introduced. As well as a live venue, the town hall now includes a dance studio, café and bar, wedding suites, banqueting, screening room and commercial catering.
Junckers’ flooring was installed in several areas, including the main auditorium where the stage was entirely rebuilt to incorporate a rise-and-fall functionality. To introduce more flexibility to the space, the ground floor seating was replaced by a retractable system. The hard-wearing surface of a Junckers’ pre-finished solid hardwood floor is very resistant to the wear and tear associated with a retractable system and the sprung quality of the flooring system will remain intact.
Junckers Black Oak Harmony flooring was identified by Holmes Miller during the design stage analysis as a sympathetic choice for the heritage building. The two-strip floorboards, also prevalent in the Black Oak Twin Herringbone installed in some areas, give a narrow parquet appearance in keeping with the original flooring and the dark colour is historically appropriate. Junckers Black Oak is made by mimicking the natural process where oak submerged in a bog takes on a dark hue which pen- etrates the tree trunk. The Black Oak stain is drawn deep into each floorboard which means it can be sanded and refinished without loss of colour. It also means the floor is much more resistant to superficial damage compared to a stained floor- board. Steven Coulson, Associate at Homes Miller added: “The flooring was specified due to a great mix of quality, sustainability credentials and sympathy to the heritage building aesthetic.”
The £22M restoration forms part of Renfrewshire Council’s regeneration programme of Paisley’s historic cultural venues. Upgrading historic buildings, particularly public buildings, is a fast-growing trend towards re-use rather than demolishing and building new. By taking a long-term view to retrofit and restore Paisley Town Hall, the Council has secured its sustainable future whilst remaining sympathetic to its history.
The flooring was installed by Partnership Flooring.
The main contractor was Morrison Construction.
22mm two-strip solid wood flooring with floating clip system
22 mm Two-Strip Solid Hardwood Flooring
14 mm Twin Herringbone Prefinished Solid Hardwood Flooring
Junckers dark grey floor for The Paul Hamlyn Hall at The Royal Opera House
Dramatic, dark floors at St Cecilia's Hall, University of Edinburgh
Textured oak flooring for Maritime Museum by BIG
Junckers creates bespoke parquet to replicate original National Gallery floor
CAST. Cowell Academy of Stage and Television
Kingston University
Rambert School of Ballet and Contemporary Dance
Royal & Derngate Theatre
Sustainable wood flooring installed at restored Bath Abbey
Leighton House Museum - Junckers Black Oak flooring
City of London Academy, The Britannia Project, Shoreditch Park
A sustainably built school - Merkinch Primary School & Family Centre