NBS Source
I'm a manufacturer

SBB Byte Wankdorf --> Room-in-Room -> Partitions -> Floors

OVERVIEW

The approximately 1,700 employees of the IT department of the Swiss Federal Railways AG, SBB for short, were previously spread over several locations in Bern. With the completion of the "Byte" on the WankdorfCity site in Bern, SBB's IT department has now been centralized at a fixed location for the first time.


Lindner provided partition and floor systems for this project. 58 Lindner Cube room-in-room systems were installed, half of which are fully glazed and half of which are full panel systems of the Logic Timber or Logic Metal type. The full panel partition systems are finished with a white melamine resin coating on the exterior and with a magnetic whiteboard surface with monitor fastenings on the interior. Access to the cube is provided by a glass door system with sound insulation. Air exchange between the office areas and the Cubes is ensured by overflow elements integrated into the full panel elements.


On the first floor as well as in the core areas of the building Lindner installed the glass partition system Lindner Life Stereo 125 and the fully glazed partition system Lindner Life Hybrid 622. The partition systems are reinforced by concealed wall reinforcements for the installation of screens and supplemented by glass doors. 


The NORTEC and FLOOR and more® floor systems ensure a pleasant tread. Individually removable panels also facilitate inspection work on the installations in the floor cavity. 


Completed Works


  • Partitions
  • Partition Systems Glass
  • Lindner Life Stereo 125
  • Partition Systems Full Panel
  • Lindner Logic 100 Timber
  • Lindner Logic 100 Metal
  • Room-in-Room
  • Lindner Cube duo
  • Floors
  • Calcium sulphate panels
  • NORTEC
  • FLOOR and more


Products featured in this case study

View all products (39)
Solid Double - No Fire Rating - Solid partition

Solid Double - No Fire Rating - Solid partition

Lindner Raised Floor Pedestals Type H

Lindner Raised Floor Pedestals Type H

Lindner Raised Floor Pedestals Type M

Lindner Raised Floor Pedestals Type M

Double Glazed - No Fire Rating - Double glazed modular partition

Double Glazed - No Fire Rating - Double glazed modular partition

Room-in-Room - Self-Contained Room Systems

Room-in-Room - Self-Contained Room Systems

More inspiration from Lindner Group

View inspiration
Projektreport Allerhuset Denmark

Projektreport Allerhuset Denmark

Maxwell Centre, University of Cambridge

Maxwell Centre, University of Cambridge

John Lewis Oxford Street

John Lewis Oxford Street

Wembley Stadium

Wembley Stadium

More inspiration from Partition panels

View inspiration
cGMP Advanced Manufacturing Area for Orthoplastics

cGMP Advanced Manufacturing Area for Orthoplastics

Compound Semiconductor Innovation Centre for CSA Catapult

Compound Semiconductor Innovation Centre for CSA Catapult

The Compound Semiconductor Facility for IQE

The Compound Semiconductor Facility for IQE

cGMP Global Packing Centre for AstraZeneca

cGMP Global Packing Centre for AstraZeneca

More inspiration from Access floor pedestals

View inspiration
The Cube

The Cube

Birmingham Library

Birmingham Library

The Shard

The Shard

HAUSER CB - Metal Ceilings, LIGNA and NORTEC raised floors

HAUSER CB - Metal Ceilings, LIGNA and NORTEC raised floors