OVERVIEW
The Proteus Waterproofing roof survey carried out found the existing flat roof system to be saturated. The existing roof build-up needed to be stripped back to the roof deck, with the main challenge of the roof refurbishment being the low up-stand heights available to the penthouses.
The project required a flat roof system manufacturer involved at the initial roof survey and specification design stage, followed by the manufacturers technical back-up to assist with unforeseen and unexpected situations to ensure a successful installation of the new roof systems.
High Performance Waterproofing
The terrace roofs above hated spaces demanded a waterproofing system with BBA certification. The fully bonded and seamless Pro- System® Plus was selected for its high performance and low odour, in conjunction with Proteus Pro-Therm Insulation to improve the roofs thermal performance and reduce the existing condensation risk.
The flat roofs that were not above heated spaces required Proteus Pro-System® Plus low odour, seamless waterproofing overlay. Proteus Waterproofing worked closely with the Client and the Proteus Approved Contractor, which also acted as the Main Contractor, to ensure the installation complied with the specification design.
Health & Safety
Safety on construction sites is always of the utmost importance, as well as keeping disruptions to other trades to a minimum. Proteus Pro-System® Plus was selected for its high performance, low odour, phased cold installation and seamless waterproofing.
Long Term Performance
Proteus Pro-System® Plus creates an elastomeric, seamless, cold applied waterproofing membrane. The Proteus Pro-System® Plus system can include warm roof insulation. The membrane does not become brittle with age, is BBA Certified with a durability statement of at least 30 years.
Pro-Epoxy Primer
Pro-Reactivation Primer
Pro-Vapour Control/Carrier Membrane SA
Case Study - Proteus Pro-Felt® - City Tower
Case Study - Proteus Pro-Felt® - CO-OP Wembley
Case Study - Proteus Pro-BW® Plus - Knolly's House
Case Study - Proteus Pro-Cold® - The Gatehouse Whaddon
Crossrail Place
Westfield Shopping Centre
Cambridge Mosque
Case Study - Proteus Pro-Felt® - City Tower
Case Study - Proteus Pro-Felt® - City Tower
Case Study - Proteus Pro-BW® Plus - Knolly's House
Case Study - Proteus Hot Melt® and Proteus Cold Melt® - Nashmills
Case Study - Proteus Pro-System® - Emma House