NBS Source
I'm a manufacturer

AliDeck Lite Board in Eastbourne, East Sussex

OVERVIEW

AliDeck is extremely pleased to have such great feedback from first-time customer N.S Engineering, who recently completed work on the Macquarie Quay remediation project in Eastbourne, East Sussex, following a recommendation from a recent EWS1 survey that specified non-combustible materials should be used when renewing the balcony decking.

No featured products in this case study

Contact AliDeck by clicking the button below to find out which products were used in this case study.

More inspiration from AliDeck

View inspiration
AliDeck make site visit to inspect installation of non-combustible aluminium terrace deck at Bermondsey penthouse apartment

AliDeck make site visit to inspect installation of non-combustible aluminium terrace deck at Bermondsey penthouse apartment

AliDeck visit fantastic aluminium terrace decking installation at timber replacement project in London

AliDeck visit fantastic aluminium terrace decking installation at timber replacement project in London

AliDeck aluminium decking used on elevated steel-framed balconies on houses in Taunton, Somerset

AliDeck aluminium decking used on elevated steel-framed balconies on houses in Taunton, Somerset

Aluminium decking fire-safe replacement for flammable composite balcony decking

Aluminium decking fire-safe replacement for flammable composite balcony decking