OVERVIEW
A recent article on our website highlighted AliDeck’s involvement in the remediation work to be conducted at the Crawford Building in Whitechapel, London. Work has since been completed, and we are delighted to share the successful results with you here. Members of the AliDeck team recently joined Darren from Tranquil on-site to see the results first-hand.
AliDeck Aluminium Decking System 4 - Complete Non-combustible Decking Solution - 800mm Board Span - 800mm Joist Span - 50-320mm Build-Up
AliDeck Non-Combustible Aluminium Junior Flat Balcony Board V2 - 800mm - Aluminium Decking
AliDeck make site visit to inspect installation of non-combustible aluminium terrace deck at Bermondsey penthouse apartment
AliDeck visit fantastic aluminium terrace decking installation at timber replacement project in London
AliDeck aluminium decking used on elevated steel-framed balconies on houses in Taunton, Somerset
Aluminium decking fire-safe replacement for flammable composite balcony decking
A three-in-one adjustable pedestal for paving and decking
Ceramic tile rail substructure system
Private Residence, London
Timber Wharf
Non-combustible aluminium decking- Acton Gardens
Latham’s Yard Balcony Refurb
Ensign Court High Rise Decking
Timber Wharf