OVERVIEW
OVERVIEW:
Broadway Studios is a major purpose-built student accomodation project delivering 432 beds across 16 storeys. Located in the heart of Glasgow's regeneration zone, the scheme is scheduled for completion ahead of the 2026/27 academic year.
THE CHALLENGE:
The curtain wall design presented several key technical challenges:
A generic wall-tie specification was unsuitable: engineered coordination and regulatory surety were essential.
THE SOLUTION
The Enterprise 25/14 Brick-Tie Channel System:
Delivering:
DELIVERED VALUE
Regulatory certainty. Fully aligned with HRB (High Risk Building) framework in both jurisdications of England & Wales as well as Scotland.
Cost efficiency. Wind load analysis reduced material usage without compromising safety.
Engineering Support. Movement joint coordination and fixing methodology resolved early.
Long-term performance. 60-year warranty for facade durability assurance.
THE RESULT
Broadway Studios demonstrates how the Enterprise System delivers engineered compliance, cost control, and facade performance on complex high-rise developments.
A full in-depth technical case study is available for review on the Enterprise System website linked.