OVERVIEW
Jaguar Land Rover’s new £500 million engine manufacturing facility at the i54 business park is situated close to the M54 motorway outside Wolverhampton.
The new plant, which is the size of 14 football pitches, is JLR’s largest investment for in-house engine design and manufacturing in a generation.
As it was impractical to install a perimeter fence to provide adequate screening from the motorway, Lang+Fulton supplied 5 separate compounds with double and single leaf gates made from 400 linear metres of Italia-100 louvres:
Waste Compound (2.4m high)
Chiller Plant Compound (4m high)
Data Centre Compound (3m high)
Filter Mist Compound (4m high)
Smoking Shelter (2m high)
Finish: hot-dip galvanized & ppc RAL7016
Italia-100 Cladding And Screening - Steel Louvre Protective Privacy Screen
Italia Wheelie Bin Stores - Steel louvre privacy secure compound
The Crystal London: Barrot Barrot grating for the mezzanine exhibition space. Each panel was a unique angular shape to add visual interest to the flooring.
The SSE Hydro: decorative wall cladding for the stage entrance constructed from Stereo-kinetic system.
The Hydro: Infill panels for the balustrade were supplied by Lang+Fulton, made from Micro-34 architectural grating.
Open mesh steel balustrades, walkways, stairs at Bradfield College Greek Theatre: DemiAlto-55×110/50×5
Roof-top Screen at Pioneer Foodstore, Carlisle
An architect designed stand-alone cycle hub for new railway station
Italia-Corten for Private Housing Project Norfolk Coast
Balustrade infill panels, open mesh flooring, stair treads and louvred screening at Milton Park: new workspaces for the science & technology sector
Portavadie Marina Resort: Steel louvred fencing and compounds to screen service plant and wheelie bins
Anson House Residential Apartments in Westminster Receives Falco Cycle Hub
Bin Bays for Stoke-on-Trent Housing
Worthing Homes - Bin Bays