OVERVIEW

The project consisted of two similar flat roof areas totalling 1,100m2 above high-rise residential blocks in a city centre location. The existing roofs were an inverted roof design that had been waterproofed with single-ply that had failed prematurely. Numerous short-term, localised repairs had failed to stop the water ingress and leaks had been a long-term problem.


It would have been impractical to remove the tons and tons of ballast and insulation from the top of the high-rise building and it was imperative to the client that removal or replacement works were not involved at all. The specific nature of this project required careful consideration, and so a survey of the roof was arranged.


The Solution

A report from an independent consultant commissioned by the client identified a problematic challenge with an overlay option. The existing falls of the roof were assessed to be poor, and so standing water would be an issue for any new waterproof covering. The report concluded that this would reduce the lifespan of an overlay waterproofing system and so was advised against. The client initially thought this to be a stumbling block and that costly and impractical modifications to the roof would need to be made.


Having worked with Polyroof on scores of other projects, the client turned to Polyroof Technical Services for a solution that could meet their stringent criteria. Following on from the preliminary discussions, Polyroof’s Technical Services assessed the site, taking core samples and then providing a suitable specification to overlay the roof with the Protec System.


The BBA certification of the Protec system specifically covers use for zero falls (completely flat) applications, meaning the client had absolute peace of mind that standing water would not be a detriment to the integrity of the waterproofing system. The client was able to achieve the original objective of an overlay system and benefited from the associated cost and time savings. Furthermore, the BBA certificate states that when used in inverted roof scenarios the lifespan of the Protec system is as long as the design life of the roof.


Work was started with J R Flat Roofing, a Polyroof approved contractor with national coverage, moving the ballast and insulation to one-side in four phases of 140m2 at a time, exposing the single-ply membrane to which the Protec system was directly applied.


Due to Protec’s rapid cure and walk-on times (30-60 mins dependent on conditions), the system is ideal for larger, phased refurbishment, as specific sections of the roof can be made waterproof with the full Protec system in one day. When carrying out the next section, the new Protec membrane forms a totally seamless and watertight joint to the existing Protec-covered areas.


Another objective was to reuse the original inverted insulation and ballast pebbles as this was cost saving and negated the need for the lifting logistics that would have been involved in bringing the ballast to ground level. Additionally, it made the process as environmentally compliant as possible by keeping waste to a minimum. The insulation and pebbles were re-applied in its original format and, due to the weight of the pebbles, was a mammoth task that required three miniveyors to help with the handling. A series of special aluminium breather vents were also fitted down to the concrete slab roof substrate to enable the surface to dry out over a period of 12 months.


The whole job was completed in three weeks and the client was delighted with the finished work. With a 20-year insurance back-guarantee and a maintenance-free waterproof membrane that will last as long as the roof stands, the client was once again left with total peace of mind that their buildings could not be better protected.

No featured products in this case study

Contact Polyroof Products Ltd by clicking the button below to find out which products were used in this case study.

More inspiration from Polyroof Products Ltd

View inspiration
Fleming Park Leisure Centre

Fleming Park Leisure Centre

Durham University Gateway

Durham University Gateway

Barton Hill Academy

Barton Hill Academy

Blackfordby St Margaret’s Primary School

Blackfordby St Margaret’s Primary School