NBS Source
I'm a manufacturer

Epping Forest College, Essex

OVERVIEW

Architects Morgan Sindall was charged with creating a state-of-the art, energy efficient building including the hot water distribution system. A specific requirement was for the system to be able to raise temperatures monthly, for the prevention of legionella. A single-pipe solution was designed, using 1.8km of nVent RAYCHEM HWAT-R self-regulating cables to maintain 60°C. Supported by 15 nVent RAYCHEM HWAT-ECO smart controllers, the necessary legionella prevention cycles could be met, pipe temperatures could be varied (to provide setback temperature savings) and thermal boosts to 65°C implemented during times of non-occupancy.

No featured products in this case study

Contact Chemelex Raychem by clicking the button below to find out which products were used in this case study.

More inspiration from Chemelex Raychem

View inspiration
Energy Efficiency Case Study - Hot Water Generation and Distribution Systems

Energy Efficiency Case Study - Hot Water Generation and Distribution Systems

Gaelic School, Glasgow

Gaelic School, Glasgow

HM Maximum Security Prison, Shotts, Scotland

HM Maximum Security Prison, Shotts, Scotland

Hilton Syon Park Waldorf Astoria Hotel, London

Hilton Syon Park Waldorf Astoria Hotel, London