OVERVIEW
Fully compatible products from the range of TBA FIREFLY™ have been chosen to compartmentalise roof voids between apartments and communal lobbies of a large apartment building in the London Borough of Lewisham, providing 120 minutes fire integrity protection as part of a wide ranging refurbishment programme carried out earlier this year.
The contract on Lewisham Homes’ Commodore Court in Albyn Road has been led by the sector specialist construction company, Mulalley & Co. with London/Sevenoaks based CLM Fireproofing carrying out the installation of the TITAN Lite™ 120:60 barrier system, in combination with Collaroll and the use of ancillary products from the FIREFLY™ range.
CLM Fireproofing was founded 30 years ago by Clive Miles and has established a reputation as a leader in the fields of both passive fire protection and fire-stopping; working in a variety of sectors on projects right across the UK. A regular user of the FIREFLY™ range, many of its operatives have attended courses at the company’s premises in Rochdale to become trained FIREFLY™ installers.
The Site Agent for CLM, Virginijus Pasvenskas, commented: “There was initially an intention to use a mineral wool flexible fire barrier, but the product was not tested for the scenario installed around the services such as a downpipe and it was upgraded to the use of the FIREFLY™ system by the client/project team. The installation of the TITAN Lite™ and the Collaroll to wrap the trusses and the services went very well and, as well as supplying specific details for the work, FIREFLY's technical team came to site to inspect the works. We completed our contract on schedule back in the summer.”
TITAN Lite™ 120:60 has been developed for use in vertical separation or compartmentation situations, offering 120 minutes integrity and 60 minutes insulation and is able to be sealed around penetrations. It is widely specified to form fire barriers within roof voids and floor voids in many different property types, including tower blocks and other HMOs.
The flexible woven material is easy to cut and fix, and is chemically treated to improve its cooling properties and therefore prevent temperatures rising in adjoining areas. The system has been fully tested to BS 476 Parts 20 & 22 and is third party certified by IFC. The six metre long rolls of TITAN Lite™ 120:60 have a minimum thickness of 6mm and are installed using special staples as well as high temperature adhesive.
Employed as part of the FIREFLY™ System and also to wrap the services which penetrate barriers such as PHOENIX, ZEUS Lite™ and APOLLO Lite™, Collaroll comes in a roll which unwraps to 10m long x 300mm wide with a sewn in concertinaed skirt. The skirt can be moulded to shape to seal it neatly to the upright barrier, which is usually at 90 degrees to the Collaroll and fixed into place using the FIREFLY™ high temperature adhesive. The R31 Staple Gun and Staples are used to staple the Collaroll to itself tightly around the penetration.
FIREFLY Titan Lite 90:60 Horizontal Fire Barrier
FIREFLY™ TITAN Lite™ Protecting Movement Joints Within New Midland Metropolitan University Hospital.
Preston Medical Facility Safe Beneath FIREFLY™ APOLLO Lite™ Fire Barriers
Hyde Park property protected using FIREFLY™ ZEUS Lite™ Barrier
FIREFLY™ APOLLO Lite™ 30:30 Fire Barriers Upgrade Protection for West Lothian Commercial Property
FIREFLY System Upgrades Roofspaces At Ashfield Wellbeing Centre
FIREFLY Phoenix Picked To Protect Pharma Giant’s New Macclesfield Plant