OVERVIEW
HAUSER is a traditional supplier of turnkey refrigeration systems, for example in the form of refrigerated shelves, counters and freezer cabinets. Besides its headquarters in
Linz, Austria, the company also operates a plant in Budweis, Czech Republic.
An office building was equipped with ceiling and floor systems from Lindner. In cooperation with the local partner Konstruktis Delta s. r. o., Lindner Plafotherm® DS 320 Type 1 metal ceilings with integrated heating and cooling functions were supplied. With regard to the floor systems, LIGNA and NORTEC raised floors were used.
Expanded Metal Ceilings
Canopy Ceilings - Free-Floating Metal Ceiling Elements
Calcium sulphate raised access floor with factory applied parquet - NORTEC STONEline
NORTEC L 38 x M - Raised Access Floor Panel
Fire rated metal ceilings
Lindner Raised Floor Pedestals Type SWH120
LIGNA S 38 ST x M - Chipboard Raised Access Floor
Lindner Raised Floor Pedestals Type M
Projektreport Allerhuset Denmark
Maxwell Centre, University of Cambridge
John Lewis Oxford Street
Wembley Stadium
The Compound Semiconductor Facility for IQE
The Rounhouse for Derby College
Ray Dolby Centre for Cambridge University's Physics Department
London Bridge Station (Network Rail)
The Cube
Birmingham Library
The Shard
Central Station Berlin Completed Works: - Metal Ceiling - FLOOR and more - NORTEC - Plasterboard partition systems - Fire protection doors
Tour Alto, La Défense, Paris - Knauf DB Green Raised Floor System
Terrazzo Raised Floor System – Cottam House, Kings Cross, London
Lucent House, Hackney
Wembley Stadium