The roof area was badly damaged by heavy storms, with all existing
ballasted solar panels lifting off the single ply roof and destroyed beyond
repair. The client needed the remedial work completed to fixed deadlines
in order to comply with insurance requirements, and wanted to optimise
the roof by replacing the pre-existing photovoltaic (PV) array with a solar
solution that would deliver superior energy generation. The office also had
to remain operational throughout the works, creating logistical challenges
No featured products in this case study
Contact Bauder Ltd by clicking the button below to find out which
products were used in this case study.