NBS Source
I'm a manufacturer

Nuffield Health Hospital, Leeds

OVERVIEW

Nuffield Hospital Leeds required the replacement of six timber door sets serving their operating theatres—three per floor—without disrupting theatre schedules or compromising hygiene standards. A survey was completed during the evening to avoid operational impact, and the full installation was delivered over two weeks.

No featured products in this case study

Contact Dortek Ltd by clicking the button below to find out which products were used in this case study.

More inspiration from Dortek Ltd

View inspiration
An innovative design for Great Ormond Street Hospital, London

An innovative design for Great Ormond Street Hospital, London

Improved safety and efficiency for Scottish Salmon, Scotland

Improved safety and efficiency for Scottish Salmon, Scotland

Specialist hygienic door design for Cambridge Biomedical Campus (CBC)

Specialist hygienic door design for Cambridge Biomedical Campus (CBC)

An energy efficient design for The Royal Liverpool University Hospital

An energy efficient design for The Royal Liverpool University Hospital