NBS Source
I'm a manufacturer

Preston Pipe Bridge - Access Solution

OVERVIEW

Fibergrate supplied and installed a GRP access walkway for pipe maintenance, spanning 61 meters across the River Tees with a pre-stressed concrete arch design supporting three large water pipes.

No featured products in this case study

Contact Fibergrate Composite Structures by clicking the button below to find out which products were used in this case study.

More inspiration from Fibergrate Composite Structures

View inspiration
Badger Run - Pedestrian Walkway

Badger Run - Pedestrian Walkway

Clocaenog Wind Farm - Bund Flooring

Clocaenog Wind Farm - Bund Flooring

Mexico Oil Refinery Reactor - Pultruded Phenolic Grating

Mexico Oil Refinery Reactor - Pultruded Phenolic Grating

Ipswich Marina - Walkway

Ipswich Marina - Walkway