OVERVIEW
Fibergrate supplied and installed a GRP access walkway for pipe maintenance, spanning 61 meters across the River Tees with a pre-stressed concrete arch design supporting three large water pipes.
Contact Fibergrate Composite Structures by clicking the button below to find out which products were used in this case study.
Badger Run - Pedestrian Walkway
Clocaenog Wind Farm - Bund Flooring
Mexico Oil Refinery Reactor - Pultruded Phenolic Grating
Ipswich Marina - Walkway