OVERVIEW
Junckers solid wood flooring has been installed at Spanish City in Whitley Bay as part of major refurbishment works. Architects ADP brought the seaside pleasure building back to its former glory by carefully restoring original decorative features in the Grade II listed building.
The works included revealing the magnificent dome in the rotunda by removing a mezzanine floor, restoring the triple height ceiling to create a large, circular space. The grand room required a complimentary floor and the choice fell on Junckers’ Black Oak, which has been fitted in a striking concentric dodecagon pattern. Installed by Junckers’ Approved Contractor Stenhouse Flooring, the project features mitred joints which require a high level of skill and experience. Junckers’ solid wood flooring was also installed in several other areas in the building, which now includes bars, shops, restaurants and a suite of rooms for events, conferences and weddings.
Contact Junckers Ltd by clicking the button below to find out which products were used in this case study.
Junckers dark grey floor for The Paul Hamlyn Hall at The Royal Opera House
Dramatic, dark floors at St Cecilia's Hall, University of Edinburgh
Textured oak flooring for Maritime Museum by BIG
Junckers creates bespoke parquet to replicate original National Gallery floor