OVERVIEW

Project Summary

Rodillian Academy, part of the Rodillian Multi-Academy Trust (Wakefield), required a bespoke, large-span smoke-control solution for an open-plan internal space. The aim was to preserve architectural openness and sightlines while ensuring effective smoke compartmentation and safe escape routes.

HAG Ltd. was appointed to design, manufacture and install a single, continuous 33-metre-wide smoke curtain — the Fireguard HS120. The system remains fully concealed under normal operation and deploys automatically on activation of the fire alarm or building management system (BMS).

Technical Scope & Specification

Product & Compliance

  • Product: Fireguard HS120 Smoke Curtain; custom-manufactured as a single 33 m span.
  • Performance Standard: Compliant with BS EN 12101-1:2005 + A1:2006, with smoke-safe classification D120, providing up to 120 minutes of smoke integrity at elevated temperatures.
  • Function: Automatically self-closes on fire alarm or power failure via a 24 V DC motor with gravity fail-safe operation.

Curtain Assembly & Construction

  • Curtain constructed from woven glass-fibre and stainless-steel fabric with an intumescent silicone coating for heat resistance and stability.
  • Designed as a single continuous curtain to eliminate the need for intermediate supports, maintaining open sightlines.
  • Housing integrated within the ceiling void to remain fully concealed when not in use.

Integration & Installation

  • Fully integrated into the building’s fire alarm and BMS, with battery backup to ensure deployment under all conditions.
  • Installed by HAG’s FIRAS-accredited engineers, ensuring full compliance, traceability and certified workmanship.
  • Installation carried out to protect the architectural intent, with the curtain cassette discreetly incorporated into the ceiling structure.

Role in Fire & Smoke Strategy

The HS120 smoke curtain forms a critical part of the Academy’s smoke control and compartmentation strategy. Upon activation, the curtain deploys to prevent the lateral spread of smoke within open-plan areas, supporting safe egress and assisting in maintaining tenable conditions during evacuation. The solution meets the fire-safety design requirements without compromising the building’s open and modern aesthetic.

Outcome & Benefits

  • Delivery of a bespoke 33 m smoke curtain with no intermediate supports, preserving open-plan design.
  • Effective smoke containment upon activation, supporting the building’s fire-safety strategy and occupant protection.
  • Certified product performance combined with accredited installation, giving assurance to architects, specifiers and building owners.
  • Fully concealed system ensures minimal visual impact on the architectural environment.

To view the full Specification Summary, please click on View More at the top of this page.

Products featured in this case study

View all products (79)
2 Hour Smoke Curtain EN 12101-1:2005 - HS120 - Smoke Curtain

2 Hour Smoke Curtain EN 12101-1:2005 - HS120 - Smoke Curtain

More inspiration from HAG Ltd. - The Door Specialists

View inspiration
Coastguard Rescue Service

Coastguard Rescue Service

Rolls Royce - HAG supplies doors for the worlds largest exhaust pipe

Rolls Royce - HAG supplies doors for the worlds largest exhaust pipe

RHS Hilltop

RHS Hilltop

Jaguar Land Rover

Jaguar Land Rover

More inspiration from Active smoke barriers

View inspiration
Battersea Power Station, London

Battersea Power Station, London