NBS Source
I'm a manufacturer

Compare variants

Altro Proof™
Altro Proof™

Verified 6 months ago

Altro

Altro Proof fast-track

Verified 6 months ago

Altro

Altro Proof standard

Summary
Collection of easy-to-apply damp-proof membranes.
Collection of easy-to-apply damp-proof membranes.
Length
Bespoke
Bespoke
Width
Bespoke
Bespoke
Height
Bespoke
Bespoke

Additional properties

Execution
Preparation:
New ground supported concrete should incorporate an integral physical functioning DPM within the construction in accordance with building regulations.
Substrates should be dry, structurally sound and free from contamination, friable materials, laitance and contaminants which may affect either the adhesion or penetration of the Altro Proof system. All residues of old paint coatings and dust must be fully removed mechanically in order to achieve maximum adhesion.
Substrates should achieve 26 N/mm² compressive strength (BS EN 12504-2:) and surface tensile strength 1.5 N/mm² (BS EN 13892-8:).
Preparation:
New ground supported concrete should incorporate an integral physical functioning DPM within the construction in accordance with building regulations.
Substrates should be dry, structurally sound and free from contamination, friable materials, laitance and contaminants which may affect either the adhesion or penetration of the Altro Proof system. All residues of old paint coatings and dust must be fully removed mechanically in order to achieve maximum adhesion.
Substrates should achieve 26 N/mm² compressive strength (BS EN 12504-2:) and surface tensile strength 1.5 N/mm² (BS EN 13892-8:).
Bond strength
To BS EN 4264, 3.5.
To BS EN 4264, 3.5.
Product Reference
Altro Proof fast-track
Altro Proof standard