Case study
Case study
Halton Borough Council had an easy decision to make in choosing Brett Landscaping to work with them on a key infrastructure project. The project was to rebuild and renovate a dual carriageway’s central reservation. The reservation, which featured low-level walls retaining grass verges, was showing signs of damage. The old low-level walls of the central reservation had crumbled and weathered due to a combination of weathering and rainwater pressure behind the wall.
Contact Brett Landscaping by clicking the button below to find out which products were used in this Case study.
Safe Handling Advice For kerbs And Flag Paving
Specialist Kerbs & Permeable Paving
Corporate Brochure
Aura CBP TDS Sept 21