Case study
Case study
Zeta Lock from Brett Landscaping has been used to pave part of the new Outer Harbour at the Port of Great Yarmouth where 24,000m2 of paving was mechanically laid. Zeta Lock has been specifically designed to be compatible with machine lay installation to enable large scale, complex projects to be installed quickly, accurately and with minimal disruption.
Contact Brett Landscaping by clicking the button below to find out which products were used in this Case study.
Safe Handling Advice For kerbs And Flag Paving
Specialist Kerbs & Permeable Paving
Corporate Brochure
Aura CBP TDS Sept 21