NBS Source
I'm a manufacturer
Compare variants

CGL Wallplank - Rainscreen Cladding System

Verified by manufacturer 12 days ago

CGL Hook-on Rainscreen - Aluminium Panel

CGL Systems Ltd Variant:
Third party certifications:
  • Fire Safety Certification

    Certificate type

  • CWCT Certificate

    CWCT Certificate

    Certificate type

  • ISO 14001 Environmental Management Systems

    Certificate type

  • ISO 9001 Quality Management

    Certificate type

  • CCPI Product

    CCPI Product

    Certificate type

Metal panel rainscreen cladding system.

Jump to:
BOS
07917 133 306 Website

Application

Suitable for use within the building envelope as a facade in high-rise, hospital, student accommodation, hotel and commercial applications.

Description

CGL Wallplank is a rainscreen cladding system that uses a interlocking plank system of folded cassette panels secretly fixed into an extruded aluminium support structure, supported by helping hand brackets attached back to the primary structure. The rainscreen wall design shall include all components such as membranes and insulation that together will ensure compliance with current building regulations.


Wallplanks are formed from flat sheet to suit project specification. 1–1.5 mm wallplanks are 24 mm deep, 2 mm wallplanks are 30 mm deep and 3 mm wallplanks are 35 mm deep.


Wallplanks can be installed in horizontal or vertical format. Long panels can be made but CGL recommend that face dimensions do not exceed 3950 mm lengths (widths vary depending on material thickness). There will also be cases when width may be restricted due to project wind loadings and CGL will advise maximum width.

 

The system is a drained rear-ventilated rainscreen façade. Air pressure in the cavity behind the panels generally equalises with pressure outside to prevent wind-driven rain from entering the cavity. Any moisture which does enter the cavity, drains down the back of the panels and exits in a controlled fashion at horizontal or vertical joints and the base of the façade.


In order for the rainscreen principle to function, the backing wall from which it is supported must achieve certain standards of air permeability, stipulated in The Building Regulations, and be capable of accommodating transmitted live and dead loads. The backing wall must also achieve specified performance requirements for fire, acoustics, and condensation risk. 


The system have been formally tested with certification from a UKAS accredited testing facility, which complies with testing requirements laid out in the CWCT publication, 'Standard for systemised building envelopes - 2005'.


Features and benefits:

  • Precision made to ISO manufacturing tolerances.
  • Variety of joint sizes available between 5mm and 30mm.
  • Available in a variety of thickness's up to 3mm.
  • All materials to have an A1 or A2-s1-d0 fire rating.
  • Suitable for large and bespoke sizes.
  • Reassessed or hairline appearance.
  • Can also be supplied perforated if required.
  • All season installation.
  • Easy maintenance.
  • Mechanical fixing methods with no use of flammable adhesives used.
  • Stiffeners/ carriers, if required are stud welded to rear of panel (subject to product design review).
  • Ventilated system.
  • Designed and tested using extruded Helping Hand UL approved brackets.
  • Fully adjustable support system provided. Suitable for zones between 100-412.
  • Prepunched holes available upon request.
  • Inclusive of thermal isolation pads
  • Site installation friendly, generally installed from top to bottom to assist with early scaffolding strike. (Bottom to top installation subject to site assessment).
  • Fire tested to BS EN 13501-1 certification.
  • Centre For Window & Cladding Technology Sequence B Dynamic Tested in accordance with NHBC testing requirements.
  • CCPI Product Verification (New Building Safety Act initiative).
  • System warranty available upon project completion.


With the exception of Cor-Ten Steel, a removable protective film is supplied on all panels and remains in place through the fabrication and installation processes to inhibit damage. CGL recommend the film be removed on the day of panel installation otherwise there is the risk that adhesive residue/ staining will remain on the panels after later removal.

General information

Color

Beige

Black

Blue

Bronze

Brown

Show more

Finish

Natural

Polished

Textured

Other

Anodized

Show more

Material

Aluminium

Guidance for specification option:

Aluminium Pre-coat. Aluminium Post -coated.

Copper

Zinc

Stainless steel

Carbon steel

Guidance for specification option:

Corten Steel

Shape

Other

Guidance for specification option:

Facetted Wallplank, Shiplap Styles, Triangular Wallplank.

Rectangle

Length

Bespoke

Width

Bespoke

Height

Bespoke

Warranty description

20 year

Guidance for specification option:

20 year standard warranty, subject to local environment. Refer to manufacturer for project specific warranties.

Uniclass

Ss_25_20_70_25 Drained and back-ventilated rainscreen cladding systemsPrimary

CAWS

H92/120 Rainscreen cladding

Specification data - Drained and back-ventilated rainscreen cladding systems

Thermal insulation

-

Manufacturer guidance

An essential part of the backing wall is the wall insulant. Insulation should never be applied to the wallplanks themselves, but always to or into the backing wall. The insulation should be resistant to moisture and provide adequate fire performance, based on the building construction and end use. Calculations are required to ensure that the overall construction achieves the specified U-value and include the effect of any regular cold-bridging of wall components.

Breather membrane

-

Material

-

Manufacturer guidance

The manufacturer recommends as good practice to apply breather membrane to the cold side of the wall insulant. If properly fitted and joint-sealed, this membrane will stop moisture penetrating the backing wall. Where wall brackets penetrate the insulation layer, particular care should be taken to seal the membrane around these penetrations. Vapour barrier membranes may also require to be fitted on the warm side of the insulant and a condensation risk analysis identifies if a membrane is needed.

Secondary support structure

Aluminium support structure – An extruded fully adjustable system of support brackets and carrier rail profile. Material: Extruded aluminium to BS EN 12020-2 in 6063 T6 grade alloy.

Manufacturer guidance

  • The profile offers a hands-free lining and levelling facility to required cladding zone (insert zone dimension from 100–320 mm). The support system is isolated to reduce thermal transmittance to a negligible level.
  • A2 or A4 Stainless-steel self-drive fasteners are supplied to connect rail to bracket. Pan-head stainless steel fasteners are supplied to connect panels to vertical support rails.

Cavity fire barriers

-

Horizontal

Supplied by others.

Manufacturer guidance

The manufacturer recommends in order to inhibit the spread of fire and smoke through the ventilated cavity, it is required to break the cavity with non-flammable closures. These can be made from rock-fibre bats or perforated intumescent sheeting and are usually fitted at floor slab levels, building corners, and around window penetrations.

Vertical

Supplied by others.

Cladding panels

-

Material

Aluminium Panel.

ACM (Aluminium Composite Material).

Guidance for specification option:

Fire classification A2 or better only allowed.

Panel joints

Labyrinth joints (secret fix).
Horizontal joint width: (20 mm standard).
Vertical joint width: (20 mm standard).
Air gap: (25–40 mm standard).

System accessories

Bullnose unit.

Coping.

Drainage channel.

Flashing.

Insulated gutters, PIR.

Insulated gutters, Rockwool.

Rainwater goods.

Colour/ Finish:

Anodized.

Polyester powder coating (PPC).

Pre-coat (PVDF).

Manufacturer guidance

All colours available, consult manufacturer for details and insert requirement.

Water penetration

Peak test pressure: 600 Pa.

Wind resistance

Peak test pressure: 2400 Pa (serviceability), 3600 Pa (safety).

Impact resistance

Category B (Retention and Safety to persons).

Sustainability data

Contains Red List materials

No

Country of material origin

Europe

Country of product manufacture

Europe

Material

Aluminium

Guidance for specification option:

Aluminium Pre-coat. Aluminium Post -coated.

Copper

Zinc

Stainless steel

Carbon steel

Guidance for specification option:

Corten Steel

Recyclability

95% Recyclability. Guidance for specification. All aluminium components are fully recyclable and can be taken to suitable recycling centres.

Recycled content

As defined in clause 7.8 of BS EN ISO 14021

20 %

Third party certifications

BIM objects

BOS

NBS BIM Object Standard

This BIM object has been authored to meet the requirements of the NBS BIM Object Standard.

Find out more about the NBS BIM Object Standard.

Platform Compatible Version
Revit
-

1

IFC
-

1

Third party certifications

Fire Safety Certification

Fire Safety Certification

CGL Wallplank-PPC-13501 Fire Test

CWCT Certificate

CWCT TESTING CGL SYSTEMS

ISO 14001 Environmental Management Systems

ISO 14001 Environmental Management Systems

EMS ISO 14001

ISO 9001 Quality Management

ISO 9001 Quality Management

EMS ISO 9001

CCPI Product

CCPI Product

CCPi Schedule of Verified Products

Literature

CGL WallPlank System Overview

CGL WallPlank System Overview

Case studies

IKEA, Edinburgh

IKEA, Edinburgh

Similar products from CGL Systems Ltd

CGL Hook-On Rainscreen - Cladding System

CGL Hook-On Rainscreen - Cladding System

CGL Traypanel Rainscreen - Cladding System

CGL Traypanel Rainscreen - Cladding System