NBS Source
I'm a manufacturer
Compare variants

Panelling | Frameduct - HPL Post-Formed - Duct panelling system

Verified by manufacturer 21 days ago

Frameduct HPL Post-formed 100mm Base rail with locks

Venesta Washroom Systems Ltd Variant:

Postformed HPL ready-to-install, metal-framed, pre-plumbed washroom panelling system.

Jump to:
+44 (0)1474 353333 Website

Application

Suitable for all dry washroom environments.

Description

Postformed HPL faced pre-plumbed washroom panelling system.


Features and benefits:

  • Hinged access panel using riveted linear-bearing hinges in zinc plated steel and nylon with riveted panel ratchets in zinc plated steel allowing 10 different opening heights.
  • Micro panel lock in polished stainless steel to provide a tamper proof security fixing to the duct panels.
  • Integrated factory fitted WC carrier in 26 mm SGL for use with wall hung WC’s.
  • Riveted slider brackets in nylon to allow the top panel to rise and fall where a mid-mounted panel is hinged.
  • Riveted push-pull clips where applicable to allow bottom panels to be removed.

General information

Color

Black

Blue

Cream

Green

Grey

Show more

Finish

Laminated

Material

High pressure laminate (HPL)

Aluminium

Steel

Nylon

Zinc

Show more

Length

18 mm

Uniclass

Pr_40_20_93_62 Pre-plumbed installation framesPrimary

CAWS

K32/15 Duct/ wall lining panels

K32/150 Duct/ wall linings – panels and proprietary frames

K32/160 Duct linings – preplumbed panels and proprietary frames

Product range

Panelling & Pre-plumbed Systems

Specification data - Pre-plumbed installation frames

Materials

High pressure laminate, extruded aluminium, galvanized steel, moisture resistant chipboard, zinc plated steel, nylon.

Panel

660 kg/m³ grade moisture resistant chipboard faced each side with high pressure paminate (HPL).

Guidance for specification option:

Panel sections fitted to subframe with zinc plated steel clips with butt joints fitted with zinc plated steel dowel clips and mating nylon dowel-docks.

Thickness

18 mm nominal.

Edge treatment

Post formed vertical edges with 1 mm nominal matching ABS.

Post formed vertical edges with 1 mm nominal contrasting ABS

Flashgaps

Melamine faced 650 kg/m³ grade moisture resistant chipboard (MFC).

Framing

Extruded aluminium base and headrail sections and rolled galvanized ultra steel wall channels.

Base rails

100 mm high powder coated two part aluminium baserail to secure subframe units.

Sub frame

Subframe tie-back system using M8 zinc plated steel tie-back rods and supporting bracketry in zinc plated steel.

Colour/ Finish

Rouge (VEN324 | LRV 17).

Papaya (VEN370 | LRV 35).

Golden (VEN366 | LRV 52).

Canary (VEN365 | LRV 65).

Lime (VEN354 | LRV 54).

Show more

Locks

With locks.

Sustainability data

Contains Red List materials

No

Country of product manufacture

United Kingdom

Material

High pressure laminate (HPL)

Aluminium

Steel

Nylon

Zinc

Show more

Literature

Panelling | Frameduct

Panelling | Frameduct

Brochure | Sanitaryware

Brochure | Sanitaryware

Brochure | Vepps

Brochure | Vepps

Case studies

Education | Selby High School

Education | Selby High School

Similar products from Venesta Washroom Systems Ltd

Panelling | Frameduct - 100 mm Base Rail  - Duct panelling system

Panelling | Frameduct - 100 mm Base Rail - Duct panelling system

Panelling | Frameduct - 100 mm Base Rail with Locks - Duct Panelling System

Panelling | Frameduct - 100 mm Base Rail with Locks - Duct Panelling System

Panelling | Frameduct HPL Square Edged - Duct panelling system

Panelling | Frameduct HPL Square Edged - Duct panelling system

Panelling | Frameduct, Hospital Recessed IPS Unit - IPS system

Panelling | Frameduct, Hospital Recessed IPS Unit - IPS system

Panelling | Rapiduct - Duct panelling system

Panelling | Rapiduct - Duct panelling system

Panelling | Rapiduct - HPL Square Edged - Duct panelling system

Panelling | Rapiduct - HPL Square Edged - Duct panelling system

Panelling | Rapiduct HPL Postformed - Duct panelling system

Panelling | Rapiduct HPL Postformed - Duct panelling system

Panelling | Vepps - 100 mm Baserail Locks, IPS - IPS system

Panelling | Vepps - 100 mm Baserail Locks, IPS - IPS system

Panelling | Vepps - 100 mm Baserail, IPS - IPS system

Panelling | Vepps - 100 mm Baserail, IPS - IPS system

Panelling | Vepps HPL Post-Formed, IPS - IPS system

Panelling | Vepps HPL Post-Formed, IPS - IPS system