Verified by manufacturer 1 year ago
CGS - Standard grade
QA Certificate
Certificate type
Decorative, high pressure compact laminate for interior applications.
Suitable for worktops and cabinetry in educational, laboratory and institutional settings where severe use and frequent cleaning is expected, and high chemical resistance is not required.
Decorative, high pressure compact laminate for interior applications. Developed specifically for functional and scientific environments, TopLab®BASE provides high durability, impact resistance, wear resistance and it is suitable for frequent cleaning. Available in standard grade (CGS) and a fire-retardant grade (CGF).
Features and benefits:
Color | White Grey Black Beige Blue |
Finish | Guidance for specification option: Crystal matt. |
Material | High pressure laminate (HPL) Guidance for specification option: Made of natural fibres with thermosetting resins with a decorative surface on both sides. A melamine overlay is applied on both sides. |
Shape | Rectangle Guidance for specification option: To be cut to size. Square |
Length | 2550 mm Guidance for specification option: 2550 x 1860 mm. 3050 mm Guidance for specification option: 3050 x 1530 mm. |
Width | 1530 mm 1860 mm |
Height | 6 mm 8 mm 10 mm 13 mm 16 mm |
Warranty description | Ten year Guidance for specification option: Ten year standard limited warranty. |
Uniclass | |
CAWS | N10/110 Purpose-made N12/320 Worktops N12/320 Worktops K13/160 Proprietary K13/160 Proprietary |
Product range |
Classification data | |
Standard | To EN 438-4. |
Classification | CGS |
Reaction to fire | To EN 13501-1, class D-s2, d0. |
Thickness | 6 mm. 8 mm. 10 mm. 13 mm. 16 mm. 20 mm. |
Finish | Crystal matt. |
Pattern | Guidance for specification option: Consult manufacturer and insert requirements. |
Colour | E 000 White - Uni Colours. E 0015 Pastel Grey - Uni Colours. E 002 Silver Grey - Uni Colours. E 004 Mid Grey - Uni Colours. E 007 Slate Grey - Uni Colours. E 009 Black - Uni Colours. E 301 Sand - Uni Colours. E 1732 Powder Blue - Uni Colours. E 2012 Aquamarine - Uni Colours. E 2501 Icey Blue - Uni Colours. W14 French Walnut - Wood Decors. W20 Bleached Pine - Wood Decors. W27 Denver Oak - Wood Decors. W 7103 Silver Maple - Wood Decors. W 7401 Oak - Wood Decors. S 000 Speckle White - Fantasy & Speckles. S 0015 Speckle Pastel Grey - Fantasy & Speckles. S 002 Speckle Silver Grey - Fantasy & Speckles. S 004 Speckle Mid Grey - Fantasy & Speckles. S 301 Speckle Sand - Fantasy & Speckles. S 1732 Speckle Powder Blue - Fantasy & Speckles. E 2012 Speckle Aquamarine - Fantasy & Speckles. E 2501 Icey Blue - Fantasy & Speckles. |
Country of material origin | Netherlands |
Country of product manufacture | Netherlands |
Manufacturing plant location | |
Material | High pressure laminate (HPL) Guidance for specification option: Made of natural fibres with thermosetting resins with a decorative surface on both sides. A melamine overlay is applied on both sides. |
| Platform | Compatible | Version |
|---|---|---|
| - | 1 | |
| - | 1 |