NBS Source
I'm a manufacturer
Compare variants

TopLab®VERTICAL

Verified by manufacturer 19 days ago

CGS - Standard grade

Trespa UK Ltd Variant:
Product certifications:
  • UK Conformity Assessed (UKCA)

    UK Conformity Assessed (UKCA)

    Certificate type

  • GreenGuard Gold

    GreenGuard Gold

    Certificate type

  • QA Certificate

    QA Certificate

    Certificate type

  • QA Certificate

    QA Certificate

    Certificate type

Decorative, high pressure compact laminate panels for demanding interior vertical applications and wall-lining, in more than 100 colour options.

Jump to:
0808 234 0268 Website

Application

From healthcare labs to cleanrooms, from educational to institutional buildings, several environments require a wide range of vertical applications where no compromise can be made on easy cleanability and durability. When it comes to functional cabinetry and integrated wall cladding solutions, special coverings for modular elements, the lining of fume hoods and splash backs, Trespa® TopLab® VERTICAL is the preferred choice of some of the world’s most demanding customers.

Description

With Trespa® TopLab® VERTICAL, Trespa provides a unique solution for vertical applications in those sectors where high performance is a must. TopLab®VERTICAL is available in a broad range of colours, finishes, sizes and thicknesses.


Electron Beam Curing is a fast, non-thermal curing method used to cure Trespa® TopLab® VERTICAL decorative surfaces. The resulting closed surface enables unique surface performance in terms of resistance and colour stability: it encompasses a remarkable range of properties, to serve the needs of the most demanding professional environments. Available in standard (CGS) and fire-retardant grade (CGF).


Features and benefits:

  • Chemical resistance.
  • Scratch resistance.
  • Impact resistance.
  • Wear resistance.
  • Easy to clean and suitable for most aggressive disinfectants.
  • Does not support bacterial growth.
  • Smooth machinability.
  • Quick installation.

General information

Color

-

Manufacturer guidance

Available in a wide range of Decors - see attached colour range.

Finish

Satin

Guidance for specification option:

Also available in Rock and Matt-Rock.

Matt

Natural

Metallic

Woodgrain

Material

High pressure laminate (HPL)

Guidance for specification option:

Made of natural fibres with thermosetting resins and a decorative surface layer on one side. A transparent topcoat is added to the surface layer(s) and cured by Electron Beam Curing (EBC).

Shape

Rectangle

Guidance for specification option:

To be cut to size.

Length

2550 mm

Guidance for specification option:

2550 x 1860 mm.

3050 mm

Guidance for specification option:

3050 x 1530 mm.

3650 mm

Guidance for specification option:

3650 x 1860 mm.

4270 mm

Guidance for specification option:

4270 x 2130 mm.

Width

1530 mm

1860 mm

2130 mm

Height

6 mm

8 mm

10 mm

13 mm

Warranty description

Ten year

Guidance for specification option:

Ten year standard limited warranty.

Uniclass

Pr_25_71_94_37 High-pressure decorative laminates (HPL or HPDL)Primary

CAWS

K13/160 Proprietary

K13/160 Proprietary

N10/110 Purpose-made

Product range

Interior Solutions

Specification data - High-pressure decorative laminates (HPL or HPDL)

Classification data

Standard

To EN 438-4.

Classification

CGS.

Reaction to fire

To EN 13501-1, class D-s2, d0.

Thickness

6 mm.
8 mm.
10 mm.
13 mm.

Finish

Satin.
Rock.
Matt.
Matt-Rock.

Pattern

-

Manufacturer guidance

Consult manufacturer and insert requirements.

Colour

-

Manufacturer guidance

Consult manufacturer and insert requirements.

Sustainability data

Country of material origin

Netherlands

Country of product manufacture

Netherlands

Material

High pressure laminate (HPL)

Guidance for specification option:

Made of natural fibres with thermosetting resins and a decorative surface layer on one side. A transparent topcoat is added to the surface layer(s) and cured by Electron Beam Curing (EBC).

BIM objects

Platform Compatible Version
IFC
-

1

Product certifications

UK Conformity Assessed (UKCA)

UK Conformity Assessed (UKCA)

UKCA - Certificate of Constancy of Performance TopLab® VERTICAL

GreenGuard Gold

GreenGuard Gold

Greenguard Gold certificate Trespa® TopLab® VERTICAL

QA Certificate

QA Certificate

Certificate of bio-based content Trespa® TopLab® VERTICAL FR-grade

QA Certificate

QA Certificate

Certificate of bio-based content Trespa® TopLab® VERTICAL STD-grade

Literature

Trespa® TopLab®VERTICAL colour card

Trespa® TopLab®VERTICAL colour card

TRESPA® TOPLAB® VERTICAL Material Property Datasheet

TRESPA® TOPLAB® VERTICAL Material Property Datasheet

TRESPA® TOPLAB® VERTICAL Delivery Programme

TRESPA® TOPLAB® VERTICAL Delivery Programme

CPD materials

Environmental Impact of Compact High-Pressure Laminates

Environmental Impact of Compact High-Pressure Laminates

Case studies

Deaconess Hospital Mannheim

Deaconess Hospital Mannheim

Palm Paper Factory Uetze

Palm Paper Factory Uetze

Ever pharma

Ever pharma

Similar products from Trespa UK Ltd

TopLab® PLUS ALIGN

TopLab® PLUS ALIGN

TopLab®BASE

TopLab®BASE