OVERVIEW
Covestro AG moved into its new headquarters in the "chemical capital" of Leverkusen at the end of 2020 (with a reduced team due to the pandemic situation). The new administration building of the world's leading supplier of polymer materials, with six floors and modern office space, offers a lot of space and optimal working opportunities for up to 750 employees.
As the general contractor for the interior work, Lindner SE handled various trades from drywall construction to subcontractor services. The system walls, built-in furniture as well as counters, doors, ceiling and floor systems were produced in-house. In addition, Lindner Leuchtenfabrik (on behalf of the companies Kinzo and Signify) supplied design luminaires for work islands.
Room-high, frameless full-glass walls allow natural light from the atrium into the inner areas. Lindner Life Freeze 137 glass partition wall systems create meeting rooms or "meeting boxes" as places of retreat in the otherwise open campus. Partly designed as curved glass wall elements, they underline the individual design claim and still meet the high static requirements.
On an area of more than 12,000 m², you will find above all the Lindner raised access floor NORTEC with sufficient installation space in the floor structure, a high level of walking comfort and for acoustic regulation.
For heavy-duty areas, the FLOOR and more® power access floor was chosen, mostly covered with textile flooring.
Among other things, 5,400 m² of the Plafotherm® GK HEKDA® heating/ cooling ceiling system ensure optimised acoustics and a good indoor climate in the open spaces. In cooperation with the architects HENN, a modern, light-open work campus was created within 20 months, in which employees can meet and cooperate more easily and efficiently.
Completed Works
Single Glazed - No Fire Rating - Frameless glass partition
LIGNA S 38 ST x M - Chipboard Raised Access Floor
Lindner Raised Floor Pedestals Type M
Lindner Raised Floor Pedestals Type S
Lindner FLOOR and more® G 40 x L/D
Expanded Metal Ceilings
Hollow Floor System with Integrated Heating - FLOOR and more® comfort
Lindner Raised Floor Pedestals Type SWH120
Projektreport Allerhuset Denmark
Maxwell Centre, University of Cambridge
John Lewis Oxford Street
Wembley Stadium
cGMP Advanced Manufacturing Area for Orthoplastics
Compound Semiconductor Innovation Centre for CSA Catapult
The Compound Semiconductor Facility for IQE
cGMP Global Packing Centre for AstraZeneca
The Compound Semiconductor Facility for IQE
The Rounhouse for Derby College
Ray Dolby Centre for Cambridge University's Physics Department
London Bridge Station (Network Rail)
Gresham Apartments, Raised Acoustic Floor - Nottingham UK
SubFloor Acoustic Raised Floor, Renovating 12 Apartments in Nottingham
Transforming a Listed Museum Near Liverpool into a modern Meeting Space using SubFloor
Transforming an Attic into an Energy-Efficient Storage Space in South Wales with SubFloor Raised Flooring
The Cube
Birmingham Library
The Shard
HAUSER CB - Metal Ceilings, LIGNA and NORTEC raised floors
Nova N2 Development - London - Modular Washrooms
MOL campus - Floor and more G40 and NORTEC
INTERNATIONAL RUGBY EXPERIENCE -> FLOOR and more®
GBC 5 - VENTEC - NORTEC- FLOOR and more