OVERVIEW
JD Gyms are a reputable company within the leisure industry. When they started to experience serious leakage problems across their estate (especially on mezzanine floors), they quickly realised that their existing shower construction does not live up to the standard of their service – and would need a reliable, guaranteed system solution.
In order to allow for a straightforward and safe replacement of existing showers without the need to change the existing pipework, a grid platform constructed of 80mm XPS building boards was proposed . The showers then were fitted with XPS linear shower trays featuring dry-fit drain technology, 12.5mm XPS building boards on the walls and surrounding floor areas were sealed by proprietary sealing and decoupling membrane, all ready to tile after 24 hours.
Up till now, 18 different sites have been completed and the shower system solution comes with one manufacturer’s guarantee on the whole installation.
wedi Fundo Drains - shower waste drains with integral trap
wedi Tools - Waterproof Sealing Tape - fleece tape used to seal joints
wedi 520 Cement Based Waterproof Membrane - Two-Part Composite Sealant/ Adhesive
wedi 320 Flexible Cement Based Tile Adhesive - flexible thin bed tile adhesive
wedi 610 Adhesive Sealant - Single Component Joint Sealant
wedi Fundo Riolito Neo Shower Element - Shower tray former
wedi brings wellness to Hilton Heathrow T5
Schwimmbad Berlin
Apex Hotel London
Wood Wharf London
Alpin Panorama Hotel - Valdaora, Italy
Savoy Hotel Restoration Project
Piccadilly Circus Underground Station - London
Scottish Parliament
Luxury Hotel Bathrooms - Hyatt Blackfriars