OVERVIEW
Concrete to form the tank walls at a Petrochemical facility benefited from having Koster BDM mixed into the batched concrete prior to its placement onsite. A vital step in ensuring that a back up waterproof system was integrated into the structure allowing for a combination of waterproofing protection once the internal lining had been installed.
Waterproof Concrete Admixture - Koster BDM
Flat roof overlay at historic lighthouse. Koster TPO Membrane.
Schneider Electronics Factory - Koster Flooring Systems
Glasgow Underground. Koster Injection Systems.
Koster Flooring Systems, 96 Middlesex St. London
One City Park
Waterproofing Retaining Basements on a Sloping Site
The Schwarzman Centre
Fulwith Mill