OVERVIEW
THE PROJECT
The One City Park development, designed by architect Sheppard Robson, is being built on a former police HQ site, is the first Grade A office scheme delivered in Bradford city centre for 20 years to address the need for high-quality offices. As a five-storey high rise building, the basement required an effective below-ground waterproofing solution to the main building core that would be fully compliant with the client's requirements and the relevant codes of practice and stand the test of time. The main contractor for the project, Caddick Construction engaged specialist concrete contractor Howard Civil Engineering for the basement build who then contacted Fosroc for assistance in producing a tailored waterproofing specification solution that would address the requirements of the project. As a trusted supplier of building materials and technical specification advice, Howard Civil Engineering has utilised Fosroc’s products for many other projects previously.
THE SOLUTION
Fosroc specified a full product solution for installation in accordance with BS8102 supported by a fully detailed waterproofing design provided by Waterproofing Design Services Limited. This included one of Fosroc’s innovative self-healing Supercast CWA product – crystalline waterproofing additive for concrete, Supercast SW20 and Supercast SWX waterstops in conjunction with Proofex Engage waterproofing and Proofex Total damp proof membranes. Materials were available to order ready to commence installation when required.
THE BENEFITS
The main core works and basement project element is now complete, allowing the next construction phase to continue. Fosroc’s Supercast CWA will allow any small cracks to ‘heal’ with free lime crystal before they create damp problems, and the tough damp and water proof membranes will protect against ground gas, chemicals and corrosion. As the Fosroc products are designed to work together, a truly reliable and robust solution is delivered that keeps long-term costs of repair and maintenance to a minimum. Additionally, the contractor was able to access high quality technical advice from specification through to application, allowing them to mitigate potential problems and delays before they happened.
Proofex Engage
Proofex Total
Supercast CWA
Crossrail Victoria Dock
Basement waterproofing at Ardley Energy from Waste Plant
Squiggly Bridge
Gowriehill reservoir
Drumhierny Woodland Holiday Lodges
The Moorings, Wales
The Willows, EnerPHit Retrofit
Forensic Laboratory Backweston
Waterproofing Retaining Basements on a Sloping Site
The Schwarzman Centre
Fulwith Mill
Central Square, Clerkenwell, London