OVERVIEW
During the core renovation of the Frankfurt office tower, the Lindner Group was entrusted with the complete basic fit-out and one of the tenant fit-outs. In addition to
carrying out various drywall works, high quality raised floors and energy-efficient heated and chilled ceilings were installed in combination with lighting systems from
Lindner. High-quality wooden doors from Lindner’s own production, related joinery work, as well as flexible system glass partitions complete the construction package. Lindner also carried out plastering and painting work as well as tile, coating and flooring work, and additional installation services.
Despite numerous challenges such as (heritage-protected) construction in existing buildings and the high logistical effort involved, the vision of a modern office tower was
successfully realized. Thanks to sustainable construction systems and building services combined with effective thermal insulation measures, the Global Tower is set to
be awarded with the DGNB Platinum certification.
Solid Double - No Fire Rating - Solid partition
Lindner FLOOR and more® G 40 x L/D
NORTEC L 30 x M - Raised Access Flooring
FLOOR and More® G 30 x L / B
Projektreport Allerhuset Denmark
Maxwell Centre, University of Cambridge
John Lewis Oxford Street
Wembley Stadium
cGMP Advanced Manufacturing Area for Orthoplastics
Compound Semiconductor Innovation Centre for CSA Catapult
The Compound Semiconductor Facility for IQE
cGMP Global Packing Centre for AstraZeneca
Gresham Apartments, Raised Acoustic Floor - Nottingham UK
SubFloor Acoustic Raised Floor, Renovating 12 Apartments in Nottingham
Transforming a Listed Museum Near Liverpool into a modern Meeting Space using SubFloor
Transforming an Attic into an Energy-Efficient Storage Space in South Wales with SubFloor Raised Flooring
Nova N2 Development - London - Modular Washrooms
MOL campus - Floor and more G40 and NORTEC
INTERNATIONAL RUGBY EXPERIENCE -> FLOOR and more®
GBC 5 - VENTEC - NORTEC- FLOOR and more