NBS Source
I'm a manufacturer

Skelton Village Hall, Cumbria

OVERVIEW

The renovation of Skelton Village Hall, led by DMB Building Ltd - Specialist Building Contractors Cumbria, marks the hall’s centenary, originally built in 1923. The renovation utilised the Retro EcoWall internal wall insulation system. The original lime plaster was preserved where possible, then Diasen thermal plaster was applied elsewhere to create a level surface for Gutex woodfibre insulation boards. A lime-based finishing plaster was then applied over these, ensuring a breathable and durable finish. The project also features other natural materials such as Thermafleece sheepswool insulation, which was installed in the ceiling. The upgrade of the hall guarantees it will remain a comfortable, energy-efficient space for the community.

No featured products in this case study

Contact Diasen by clicking the button below to find out which products were used in this case study.

More inspiration from Diasen

View inspiration
Lanercost Barn Revival

Lanercost Barn Revival

Scottish Georgian Country House

Scottish Georgian Country House

Deep Retrofit, Lake District Cumbria

Deep Retrofit, Lake District Cumbria

Farmhouse Renovation Cumbria

Farmhouse Renovation Cumbria