OVERVIEW
For any retail application, there is usually a balance to be made between the functionality of easy access with the absolute need for security. In the case of this new build store for ASDA, the minimum requirement was for high performance steel doors that had to be delivered on time, to specification and within budget.
Strongdor worked with the architects and contractor to ensure the supply of the doors that more than met the criteria.
Steel Door - Thermal Panic Exit
Steel Door - Thermal Personnel
Steel Door - Personnel with Louvre
Steel Door - Fire Rated Panic Thermal
Steel Door - Panic with Vision
Steel Door - Personnel
Steel Door - Panic
Steel Door - Panic Exit with Louvre
Steeldor: Enterprise Court, Blackpool
Steeldor: Wirral Metropolitan College
Steeldor: AFC Fylde Mill Farm
Steeldor: Cambridge Cycle Point
cGMP Advanced Manufacturing Area for Orthoplastics
Compound Semiconductor Innovation Centre for CSA Catapult
The Compound Semiconductor Facility for IQE
Glasgow Royal Infirmary University Tower for NHS