Almac Building Electrically Conducting Resin Floor
Arturo
The Almac Building in Northern Ireland needed a 2,400 m² storage area for flammable solvents to have an electrically conducting floor. This was necessary to ensure the materials' safe containment and help with explosion control. The floor had to be chemically resistant, support VNA forklift trucks, and meet specific electrical resistance standards. GMP Industrial Ltd. installed the floor using Arturo's static resin floor system, which included primers, repair mortars, and a self-smoothing floor. The project was complex due to the sensitivity of the area and the need for precise electrostatic control. The installation was completed in October 2022, with final approval granted in November 2022.