NBS Source
I'm a manufacturer
Pliteq

Pliteq

CREATING BUILDING ACOUSTIC PRODUCTS USING RECYCLED CAR TYRES DIVERTED FROM LANDFILL.

+44 203 9846444 Website

Sort by:

Showing 1-12 of 12

Sponsored
Boclair Mews

Boclair Mews

Pliteq

The main objective of the acoustic design was to meet the acoustic requirements whilst reducing the embodied carbon of the acoustic design. This was achieved by using GenieMat® RST, which is made from 94% recycled car tyres diverted from landfill, and the carbon negative GenieBoard. As a result, a saving of 16.6kg CO2/m2 was achieved by using recycled and recyclable products compared to traditional construction types. This equates to a total of 73 tonnes of C02e saved across the project. As this build-up is dry laid, it is fully demountable and recyclable at the end of its life. The post completion testing demonstrated that the build-up exceeded the acoustic requirements in average by 4dB in airborne (providing a DnTw of 60dB) and 2dB in impact (providing a L'nTw of 54dB). Test report: R-10255-GH-RRM 
Sponsored
Brigade Fitness Studio

Brigade Fitness Studio

Pliteq

Located on the first floor, above an office space, Brigade strives to be a good neighbour and ensure that the exercises in the fitness classes do not cause noise disturbance to the space below.
Sponsored
Duhamel Place

Duhamel Place

Pliteq

This newly renovated block is a new executive apartment scheme based on Duhamel Place, St Helier.With completion in Q4 2023, this selection of modern new build apartments come to the market offering spacious living, whilst allowing plenty of natural light throughout. The design of the apartments has been done by Page Architects and finished to a high specification by Park Homes.Build-up 1: 5mm laminate flooring (Carpet in bedrooms) – 25mm GenieBoard 302 – 5mm GenieMat RST05 – 18mm plywood – 185mm steel joists – 150mm acoustic insulation within joists – 2No 15mm FireLine board – Suspended metal frame ceiling incorporating GenieClip LB – 12.5mm wallboard – skim finish.Build-up 2: 5mm laminate flooring (Carpet in bedrooms) – 5mm GenieMat RST05, 175mm concrete slab, GenieClip RST ceiling - 12.5mm wallboard – skim finish.The post completion testing demonstrates that the environmentally friendly construction has exceeded residential requirements by 3dB in airborne (achieving DnT,w +Ctr 48dB in situ) and 7dB in impact (achieving L'nT,w 55dB in situ) while offering a quick and simple install. 
Sponsored
Kidbrooke Village

Kidbrooke Village

Pliteq

With completion in Q3 2024, this selection of modern new build apartments come to the market offering spacious living, allowing plenty of natural light. The acoustic design of the apartments has been targeted to exceed Approved Document E by 5dB which has been achieved to provide exceptional living experience to the residents. The development has been finished to a high specification by Berkeley Capital East Thames and specialist Flooring Contractors.The environmentally friendly construction has exceeded residential Approved Document E requirements plus 5dB while offering a quick and simple install and cost saving.
Sponsored
MeadowBank Sports Centre

MeadowBank Sports Centre

Pliteq

Gym with top of the range fitness equipment, dumbbells up to 50kg, watt bikes and row machines. Lifting platforms integrated flush within the remaining gym area and colourised to highlight drop area.“We recently installed Pliteq flooring in our brand new Meadowbank facility. The product is top quality and the noise dampening in our free weights area is great. The noise from dropping weights is completely minimised making the experience of other users more enjoyable. There is also no reverb heard or felt in other rooms nearby.”
Sponsored
Merchant Quay

Merchant Quay

Pliteq

Merchant Quay is a development of 1, 2 and 3 bedroom apartments by Barratt Homes in the vibrant area of Leith.The main objective of the acoustic design was to meet the acoustic requirements whilst reducing the embodied carbon of the acoustic design. This was achieved by using GenieMat RST, which is made from 94% recycled car tyres diverted from landfill, and the carbon negative GenieBoard. As a result, a saving of 16.6kg CO2/m2 was achieved by using recycled and recyclable products compared to traditional construction types. This equates to a total of 139 tonnes of C02e saved across the project. As this build-up is dry laid, it is fully demountable and recyclable at the end of its life. Build-up: Floor finish - 25mm GenieBoard 302 - 3mm GenieMat RST03 - 18mm floorboard - 240mm solid wood joists - Resilient bar - 2No 15mm plasterboard.The post completion testing demonstrated that the build-up exceeded the acoustic requirements by 6dB in airborne (providing a DnTw of 62dB) and 2dB in impact (providing a L'nTw of 54dB). Test report: RPS‐BAR01‐EAS05‐MER07‐190424
Sponsored
Plumstead - West Thamesmead

Plumstead - West Thamesmead

Pliteq

Still ongoing, this selection of modern new build apartments come to the market offering spacious living, allowing plenty of natural light. The design of the apartments has been done in close corporation between the design team and installed to a high specification by Berkeley Capital East Thames and specialist Flooring and Carpentry Contractors below Luxury Vinyl tiles and wood floors.The environmentally friendly construction has exceeded Approved Document E requirements plus 5dB while offering a quick and simple install and cost saving.Further design work was carried out to acoustically isolate the ground floor industrial unit on Plot 6 with the GenieMat® FF50NC while minimising the deflection under various live loads. Materials were installed to a high specification by the specialist concrete / frame contractor.Further designs were developed to ensure that the industrial unit ceilings were isolated to mitigate noise intrusion into the luxury apartments. This was designed using the GenieClip® RST and GenieClip® LB. These products will be installed by the Specialist Drylining Contractor.
Sponsored
Royal Exchange

Royal Exchange

Pliteq

With completion, this selection of modern new build Manhattan styled apartments come to the market offering spacious living in the centre of Kingston-upon-Thames. The design of the apartments were finished to a high specification by St George City and Specialist Screeding Contractors.The environmentally friendly construction using the GenieMat® FF05NP has exceeded residential Approved Document E requirements while offering a quick and simple install and cost saving.Ensuring that residents have state of the art facilities, a gym has been included in the development. Mitigating heavy-hard impacts in a gym is not a challenge, as the use of the GenieMat®FIT70 gym tile allows residents to enjoy the facilities whilst ensuring that sound is not transmitted into the residential units.
Sponsored
Snap Fitness

Snap Fitness

Pliteq

OVERVIEWSpread over three floors, the 9,000sqm facility offers users the very latest equipment including:A dedicated spin studioAn additional group exercise studio offering both live and virtual classesBoutique functional training area complete with a sled track, battle ropes, core bags, plyo boxes and much moreA large free weights area with dumbbells ranging from 2kg to 50kgThe club will offer a wide range of group exercise classes focusing on both cardio and weights. There will also be luxurious private changingfacilities complete with individual showers for members to use.ACOUSTIC SOLUTIONThe new facility is flanked by retail businesses and residential accommodation above, this focused the attention given to the buildings acoustic performance. Not only were they looking to mitigate any vibration caused by weight drops in the basement, they also had functional areas and spin suites to deal with.The solution identified by the acoustical consultant was the GenieMat FIT70 sitting on top of a layer of GenieMat FF25. In the functional suites and spin studio the solution was installing GenieMat FF25, as the operator wanted to offer a mixture of finishes in these areas. In the middle of the strength zone they installed a track that was detailed with the GenieMat FIT70 standard ramps, this demonstrated a clean and tidy transition between the two working areas.
Sponsored
Snap Fitness 24/7 Bradford

Snap Fitness 24/7 Bradford

Pliteq

ACOUSTIC SOLUTIONThis fitness centre is located above a number of noise sensitive retail outlets and the existing wood effect vinyl flooring was not attenuating the noise and vibration from heavy impact in the free weights area.Further to comparative on site testing the client selected GenieMat FIT70 installed above a GenieMat FF25 floating floor.To address the height difference between the old and new flooring systems GenieMat FIT70 Standard Ramps were installed around theperimeter of the GenieMat system.
Sponsored
Snap Fitness 24/7, Ashford

Snap Fitness 24/7, Ashford

Pliteq

ACOUSTIC SOLUTIONThe client was impressed by the performance, quality and ease of installation of the GenieMat FIT Hybrid System installed at a previous location. When a new gym was proposed in a mixed use development with both restaurant and cinemas in the adjacent spaces the client insisted that the gym be installed with the GenieMat FIT Hybrid Systems. The noise and vibration from heavy impacts was reduced to acceptable levels in the adjacent spaces.
Sponsored
Snap Fitness 24/7, Dover

Snap Fitness 24/7, Dover

Pliteq

Snap fitness wanted to mitigate heavy impact noise associated with the free weight area, as this gym was located in an old paper mill surrounded by a mix of noise sensitive retail and office units.ACOUSTIC SOLUTIONThe client selected GenieMat FIT70 installed on top of a GenieMat FF25 floating floor as the most cost effective and efficient system toreduce disturbance to the adjacent tenants.

Showing 1-12 of 12