OVERVIEW
Project Overview
The Central Bank of Ireland required a high-capacity grease management solution to support a major staff catering facility within their landmark North Wall headquarters. As a new building with extensive basement infrastructure, the design brief demanded full compliance with IS EN 1825 Parts 1 & 2, long-term odour prevention, and a maintenance strategy capable of working at Basement Level –2, where conventional access for pump-outs was not feasible.
Key Requirements
Solution Delivered
1. Custom-Designed BIOTRAP® NS50 Greasetrap
Taylormade designed, manufactured, installed and now maintains a 20,000 litre NS50 BIOTRAP® system specifically engineered for the Central Bank’s catering load.
2. Modular Fabrication for Basement Access
Due to the size of the NS50, the unit could not physically fit through the building’s access routes.
Our engineering team redesigned the system as a four-piece modular unit, transported the sections individually, and welded the entire tank together in situ in Basement Level –2.
This eliminated construction constraints without compromising structural integrity or performance.
3. Innovative Access Chute for Safe Pump-Outs
Servicing a 20,000 L system at Basement –2 posed a significant challenge. To overcome this, Taylormade designed a dedicated external access chute, allowing waste disposal contractors to insert the suction pipe into basement 2 via this access channel.
This solution has become a benchmark for deep-basement grease management installations.
4. Installation & Commissioning
Performance & Results (2021–Present)
Since installation:
The Central Bank facility management team have noted the simplicity of servicing and the reliability of the system despite extremely high daily catering volumes.
Key Benefits Delivered
BIOTRAP-AG Above Ground - Grease Trap
Google Watermarque Building – BIOTRAP® NS35 Grease Management Installation
Google Watermarque Building – BIOTRAP® NS35 Grease Management Installation