Broadway Studios, Glasgow
EVOLUTION FASTENERS (UK) LIMITED
OVERVIEW:Broadway Studios is a major purpose-built student accomodation project delivering 432 beds across 16 storeys. Located in the heart of Glasgow's regeneration zone, the scheme is scheduled for completion ahead of the 2026/27 academic year.THE CHALLENGE:The curtain wall design presented several key technical challenges:16-storey height requiring Type 1 non-combustible performance,Wind loads up to 1.53 MPa,Large cavity depths (up to 232mm),Movement joint coordination at upper levels,Fixing into galvanised steel without compromising coating integrity,High Risk Building status requiring strict regulatory compliance (Building Safety Act).A generic wall-tie specification was unsuitable: engineered coordination and regulatory surety were essential.THE SOLUTIONThe Enterprise 25/14 Brick-Tie Channel System:Delivering:Type 1 compliance (per BS EN 845-1 and PD 6697),Adjustable tie positioning,Optimised tie and fastener spacing via wind load analysis,Stainless-steel fasteners,Stainless-steel compression sleeves,Stainless-steel 25/14 channel,Stainless-steel wall ties,60-year system warranty.DELIVERED VALUERegulatory certainty. Fully aligned with HRB (High Risk Building) framework in both jurisdications of England & Wales as well as Scotland.Cost efficiency. Wind load analysis reduced material usage without compromising safety.Engineering Support. Movement joint coordination and fixing methodology resolved early.Long-term performance. 60-year warranty for facade durability assurance.THE RESULTBroadway Studios demonstrates how the Enterprise System delivers engineered compliance, cost control, and facade performance on complex high-rise developments.A full in-depth technical case study is available for review on the Enterprise System website linked.