The Peel, South Kilburn
RYNO
Enhancing Public Realm and Social Infrastructure at the Peel Project, South KilburnThe Peel Project is part of the wider South Kilburn Regeneration initiative, a comprehensive urban redevelopment effort focused on enhancing the area's housing, infrastructure, and social value. The project aimed to provide mixed-use spaces, balancing affordable housing with private sales, and creating new community amenities. This required a coordinated approach, especially for improving the public realm and ensuring compliance with stringent fire safety regulations.The scope of the project included:46 Affordable Homes for existing South Kilburn Council tenants98 Shared Ownership Units184 Private Sale HomesA New Health Centre, along with a pharmacy, café, and gymAffordable Workspace and key public realm improvements such as a new public plaza Reliable TerraSmart Non-Combustible Pedestal Paving System for Secure and Stable Outdoor Spaces For this project the TerraSmart Non-combustible Pedestal Paving System: Fixed Head was used, our team supplied over 12,000 TerraSmart non-combustible adjustable paving pedestals (RP-FR range), working closely with All Metal Roofing Ltd. The use of non-combustible materials was crucial, given the project’s stringent fire safety requirements. RP-FR | Adjustable Paving Support Pedestal:The RP-FR is designed to offer millimetre-perfect adjustability between 25mm and 505mm, making it ideal for a variety of outdoor spaces, from terraces to roof decks and balconies. Its features include:Material Compatibility: Suitable for all calibrated paving types, such as porcelain, concrete, and natural stone.Locking Stability: The integrated locking ring ensures absolute stability once installed.Durability: Manufactured from steel with zinc-nickel electroplating, offering superior corrosion resistance.Versatility: Ideal for terraces, podiums, roof decks, and inset balconies, with base holes for substrate fixing when required.This solution was pivotal in ensuring a secure, durable, and compliant outdoor paving system, offering stability and flexibility for the project's varying outdoor areas. Achieving Success Through Smooth CollaborationThe use of our non-combustible adjustable pedestals helped the project meet its strict safety and performance standards while providing a reliable and adaptable solution for the public realm improvements. The Peel Project stands as a testament to the importance of integrating fire-safe, durable materials in large-scale urban regeneration projects, contributing both to the safety and long-term satisfaction of the residents and the local community.