NBS Source
I'm a manufacturer
RYNO

RYNO

FINISH STRONG | Complete, integrated systems enhancing life on the skyline.

+44 (0)203 967 3500 Website

Sort by:

Showing 37-47 of 47

Sponsored
The Met Building

The Met Building

RYNO

This reimagined building in Fitzrovia, which puts people, wellness, and sustainability first, is another project we are particularly proud of and here’s why.The Met Building is 12 storeys high and one of a few such examples in London’s West End. Its design was inspired by one of New York’s landmark buildings, Lever House, one of Manhattan’s leading examples, which inspired decades of US corporate architecture.While the building’s interiors are crafted to appeal to corporates and creatives, the Tower has been designed to put people first, offering breathtaking views across London, and focusing on efficiency and productivity.The whole roof terrace of the Met Building’s Podium was built over the top of the existing roof and on a huge network of steels that are designed to direct the load away from the roof below.The system used on the roof terrace is our TerraSmart® Rail Paving System finished in our Porcelain Paving Range. This system features super-strong, 100% recyclable aluminium joists, overlapping to create a lattice framework that delivers maximum support for the porcelain paving above. In addition to complementing the overall aesthetics of the entire project, the system is fully non-combustible (Class A1 fire-rated) and, as such, in perfect harmony with the focus on the wellness and safety of all the building’s occupants. The porcelain pavers were inspired by nature and feature the performance of high-quality ceramics and environmentally conscious manufacturing that aligns with the project’s focus on sustainability.And to top it all, the entire solution installed is backed by our RYNO® IGNO® 30-year system warranty and 60-year design life.In total, the RYNO® TerraSmart® Rail Paving System was installed on 3 terraces at the Met Building, all built on the existing steel frame, and the planters that add to the outdoor experience have been integrated into the design and placed directly on top of the RYNO paving system.We are proud to have collaborated very closely with Vert Projects (the Main Contractor) and The Landscape Partnership (the Landscape Architect) in delivering this great design.
Sponsored
The Old War Office - Refurbishment

The Old War Office - Refurbishment

RYNO

The Old War Office is a magnificent refurbishment of Winston Churchill's headquarters during the World War II. The sensitive restoration of this Grade 2 historic building includes a 125-room world class Raffles Hotel and 85 luxury residences, along with restaurants, exclusive bars, a Spa and Wellness centre. Referred to as London’s anticipated destination, this architectural landmark opens its doors to the public in Summer 2023.RYNO’s involvement in the scheme included providing the paving and substructure to the Centre triangle Courtyard and the Penthouse Roof Terraces. The triangle Courtyard was finished with a RYNO Quadro porcelain range and supported on our TerraSmart Rail system. The system uses a double lattice structure to provide superior support to the pavers even around the complex curves of the planters on the courtyard and penthouse terraces. The design and detailing of the build-ups from concept to completion has been brilliant, fully complementing the building’s magnificent heritage and unique character.RYNO worked very closely with The Gardenists to ensure the rail layout and build-ups were designed to absolute perfection. Seeing is believing and as Calvin Dalrymple, Specification Manager at RYNO, testifies “to come to the site and see the results…, they really just speak for themselves. Knowing and understanding the coordination that's gone into this whole project and now to see it looking so fantastic has really been a huge reward.” Home to Winston Churchill and David Lloyd George, the Old War Office was designed in a trapezium shape to maximise the use of the land in Whitehall. Of the 25 million bricks that make up the building, the first was laid in 1901: the building was completed in 1906. For all Bond-fans out there, the building has featured in the background of many films: its first Bond-appearance was in 1983.
Sponsored
The Peel, South Kilburn

The Peel, South Kilburn

RYNO

Enhancing Public Realm and Social Infrastructure at the Peel Project, South KilburnThe Peel Project is part of the wider South Kilburn Regeneration initiative, a comprehensive urban redevelopment effort focused on enhancing the area's housing, infrastructure, and social value. The project aimed to provide mixed-use spaces, balancing affordable housing with private sales, and creating new community amenities. This required a coordinated approach, especially for improving the public realm and ensuring compliance with stringent fire safety regulations.The scope of the project included:46 Affordable Homes for existing South Kilburn Council tenants98 Shared Ownership Units184 Private Sale HomesA New Health Centre, along with a pharmacy, café, and gymAffordable Workspace and key public realm improvements such as a new public plaza Reliable TerraSmart Non-Combustible Pedestal Paving System for Secure and Stable Outdoor Spaces For this project the TerraSmart Non-combustible Pedestal Paving System: Fixed Head was used, our team supplied over 12,000 TerraSmart non-combustible adjustable paving pedestals (RP-FR range), working closely with All Metal Roofing Ltd. The use of non-combustible materials was crucial, given the project’s stringent fire safety requirements. RP-FR | Adjustable Paving Support Pedestal:The RP-FR is designed to offer millimetre-perfect adjustability between 25mm and 505mm, making it ideal for a variety of outdoor spaces, from terraces to roof decks and balconies. Its features include:Material Compatibility: Suitable for all calibrated paving types, such as porcelain, concrete, and natural stone.Locking Stability: The integrated locking ring ensures absolute stability once installed.Durability: Manufactured from steel with zinc-nickel electroplating, offering superior corrosion resistance.Versatility: Ideal for terraces, podiums, roof decks, and inset balconies, with base holes for substrate fixing when required.This solution was pivotal in ensuring a secure, durable, and compliant outdoor paving system, offering stability and flexibility for the project's varying outdoor areas. Achieving Success Through Smooth CollaborationThe use of our non-combustible adjustable pedestals helped the project meet its strict safety and performance standards while providing a reliable and adaptable solution for the public realm improvements. The Peel Project stands as a testament to the importance of integrating fire-safe, durable materials in large-scale urban regeneration projects, contributing both to the safety and long-term satisfaction of the residents and the local community.
Sponsored
The Terrace | Lee Valley

The Terrace | Lee Valley

RYNO

Of all our refurbishment projects, this one was one of the smoothest in its deployment, and amongst the most exciting & rewarding in its outcome.Lee Valley is a 10,000-acre (40 km2) Regional Park that offers sporting & outdoor activities, as well as the unique opportunity to get close to nature, learning & exploring its natural surroundings, gardens, and nature reserves.The Lee Valley White-Water Centre, officially opened on 9 December 2010 by Anne, Princess Royal, was constructed to host the slalom events during the London 2012 Olympic Games, and still hosts international events, attracting visitors from across the globe. Since 2012, Lee Valley has hosted the World Championships and two World Cups.In 2023, the ICF Canoe Slalom World Championships will attract over 300 of the world's top athletes to the Lee Valley White Water Centre.A local contractor who knew RYNO was impressed by our composite decking, our service & reputation, and introduced us to the project manager of Lee Valley Park Authority.The project was a full refurb of The Terrace which had an ageing & poorly installed wooden decking and a damaged waterproofing membrane that was leaking through to areas underneath. Some of the boards had already been removed to inspect the damage and reveal the extent of the work that needed to be undertaken. Such was the state of the decking that the area had been cordoned off and the café was unable to make use of this space!What was required was a like-for-like replacement aesthetically, which is why we selected & installed our TerraSmart™ Composite system, featuring our Classic Decking Boards, supported by high-load bearing aluminium substructure & RDA-C ‘Clip-on’ Self-levelling Adjustable Decking Pedestal, ideal for terraces subject to high foot traffic.We recommended Valley Provincial as installers who stated: "The TerraSmart decking system was the perfect choice for this project. The system’s ease of installation enabled our site teams to make excellent progress. From pricing through to delivery, Ryno where very supportive and we look forward to installing their decking system on future projects."The entire project was delivered on budget, on time, and, of course, by the deadline for the next event!
Sponsored
Timber Wharf

Timber Wharf

RYNO

A residential development, Timber Wharf is located on the corner of the Roman-built Kingsland Road and 19th-century Regents Canal and features commercial space as well as a canal-side restaurant.The residential area is grouped around a quiet cobbled courtyard offering a sheltered play area, while the waterfront apartments make up the courtyard’s northern edge and are set back from the canal, overlooking a very attractive, quaint and safe community garden.We worked very closely with Kier Group PLC (one of the largest regional builders in the UK) and ALU Installations (a leading installer of non-combustible decking and cladding systems in the UK) to deliver this very important remediation project.The timber boards on the walkways and balconies along the facade and the waterfront were replaced with our BalcaSmart® Aluminium and TerraSmart® Aluminium systems, which are ideal for remediation, new-build, and refurbishment projects.The refurbishment project was completed this year, delivering peace of mind to residents and owners alike, especially after the Grenfell Tower fire and changes to fire safety regulations.Installed with great care and attention to detail, seamlessly meeting stairwells and other structural elements, our BalcaSmart and TerraSmart Aluminium systems complement the overall aesthetics of the building, are lightweight, long-lasting, and most importantly able to meet the load requirements of its walkways, which also form part of the fire escape routes.Both BalcaSmart and TerraSmart Aluminium systems carry our IGNO mark of assurance for non-combustibility and reassure specifiers by way of a 30-year warranty and a 60-year design life (when used as part of a complete RYNO IGNO system).
Sponsored
Tower 12 Spinningfields

Tower 12 Spinningfields

RYNO

Tower 12 takes its name from both the number of floors it spans and the fact it was the twelfth building in Spinningfields, Manchester.Due to the area being dominated by commercial developments, often inhabited by financial industry tenants, the Spinningfields area has been dubbed the “Canary Wharf of the North”. Located in the heart of this bustling district, Tower 12’s design offers a unique, holistic, and modern work environment.This vibrant area, furnishing both residents and office workers with entertainment, bars, and restaurants, also features and celebrates the local heritage with the Peoples History Museum located just across the river. This is mirrored with Tower 12 whose façade emanates the industrial heritage of the area but whose function retains modern refinement.Flexible Business Interiors created the terrace spaces on Tower 12 using the pedestal paving system, which is comprised of our specifically designed paving pedestals and porcelain tiles.The overall project design is enhanced by the seamless transitioning from indoor to outdoor spaces: achieved using Ryno’s simply adjusted RP-FR non-combustible paving pedestals.The porcelain tiles, in the shade Argento from the Quadro range, punctuated the space with their elegant, contemporary finish. This paving choice created a stain-resistant, slip-proof, and non-combustible surface ready to face the test of time. 
Sponsored
Trinity Mews Residential Remediation

Trinity Mews Residential Remediation

RYNO

The Trinity Mews project is a residential property in Stepney, in the East-end of London. As a remediation project, the building already featured a roof terrace in disrepair that needed to be replaced. Originally fitted with timber, the wood had begun to rot away. The system used - TerraSmart AluminiumThis is a non-combustible decking system designed for use on terraces or waterproof substrates. The RDFR pedestals, with base rubber shock pads and ADS25 joists, formed the system substructure of the remediated terrace. The finish was made using ADB-60 aluminium decking boards in Anthracite Grey. The TerraSmart Aluminum system is IGNO certified meaning it satisfied the requirement to be A2 s1 d0 fire classified.Further improving on the timber deck it replaced, the system had to be durable and slip-resistant. As ADB boards are classified as a "low slip risk" on wet and dry and see no signs of wear after 100,000 footfalls, they comfortably met both sets of criteria.Location: StepneyCompleted: 2021Client: A property management company
Sponsored
University of Liverpool

University of Liverpool

RYNO

With over 22,000 students on campus, the University is investing in its teaching, research and residential area. They employed the TerraSmart Rail system in their paved areas to help support this development.Systems Used - TerraSmart RailTerraSmart Rail was installed due to its light system weight and its lattice structure. Having a lattice structure provides multi-directional support across each paver which is ideal for high-footfall areas. ChallengesThe ground top surface that the system sits on has multiple level changes across the area. On top of this, the final finish also had to integrate with a traditional solid build-up. This meant ensuring that the rails were perfectly level across the finish.Location: University of LiverpoolCompleted: 2022Architect: BCALandscapes
Sponsored
Wallis Road, Hackney Wick

Wallis Road, Hackney Wick

RYNO

The post-industrial area of Hackney Wick has, in recent years, undergone large-scale regeneration.Sitting on the site of a dilapidated Wallis Road factory and yard space, this mixed-use development with 44 luxury loft apartments and 2000 sqm of commercial workspace retains the character of the area.SystemQuadro porcelain paving tiles in the shade ‘Crema’ were used across each of the private balconies, as well as on the roof terrace.Tiles were supported by various RYNO height-adjustable pedestals.Ease of InstallOn roof terrace areas, RynoPaveSupport RPF Adjustable Paving Pedestals were used to support porcelain tiles.RPF Pedestals raise the tiles off the roof, allowing for fast drainage and maintenance access when required. They have a large supporting base, which protects the roofing membrane.
Sponsored
Whitechapel Phase 2

Whitechapel Phase 2

RYNO

The project was part of a major regeneration plan to deliver around 650 flats, commercial floorspace, off-street parking, communal courtyards, landscaped and rooftop gardens, and a range of other facilities and amenities for residents to experience and enjoy.As the project involved high rise buildings, the first thing was to conduct a wind uplift assessment to determine the risk of strong winds and recommend the right solution to guarantee the safety of all occupants and residents. The survey revealed that there was a 2.16k N/m2 uplift force on the horizontal surfaces of the project so to guarantee a safe and secure installation we delivered our TerraSmart Rail Paving System with the Visual Wind Uplift Fixing option.TerraSmart Rail features super-strong aluminium joists, which overlap to create a lattice framework that offers the maximum level of support for pavers, in any application, especially high trafficked communal areas. The Visual Wind Uplift Fixing option, which has been successfully tested to withstand uplift equivalent to gusts more than 200 mph, is supplied with discreet flange headed screws and washers to secure the paving to the rail system via bespoke tapped holes. On application, these clamp the paving to the rails and provide a successful countermeasure against the effects of wind uplift during adverse weather conditions.The high-quality accommodation that is characteristic of this regeneration project, offers residents roof terraces, segmented into individual private gardens, with fantastic views of the city for a safe and truly unforgettable experience.
Sponsored
Wood Wharf A2/A3 Roof Terraces, Canary Wharf

Wood Wharf A2/A3 Roof Terraces, Canary Wharf

RYNO

See how RynoPaveSupport paving pedestals helped create a sophisticated roof terrace in the new neighbourhood rising above the area of Canary Wharf.

Showing 37-47 of 47